Collection: New stock arriving Mar/April '25

39 Litre 1414HE Top Loading, requires 20 Amps

55 Litre MAS1814HE Top Loading, requires 20 Amps

93 Litre MAS1823HE Top Loading, requires 30 Amps

133 Litre Stackable 2318HE Top Loading, requires 36 Amps

165 Litre Stackable 2323HE Top Loading, requires 44 Amps on Sgl Phase (can be back-ordered with 3 Phase wiring which requires 29 Amps).

All other models can be back ordered. Lead time for back orders is approx 14 weeks plus 6-8 weeks shipping.

New stock arriving Mar/April '25