Collection: Kilns in stock from October shipment

39 Litre 1414HE Top Loading, requires 20 Amps
3 LEFT AT 2024 PRICE - $4660

55 Litre 1814HE Top Loading, requires 20 Amps
55 Ltr SOLD OUT

93 Litre MAS1823HE Top Loading, requires 30 Amps
93 Ltr SOLD OUT

133 Litre Stackable 2318HE Top Loading, requires 36 Amps
133 Ltr SOLD OUT

165 Litre Stackable 2323HE Top Loading, requires 44 Amps on Sgl Phase, 29 Amps on 3 Phase 
165 Ltr SOLD OUT

All other models can be back ordered. Lead time for back orders is approx 14 weeks plus 6-8 weeks shipping.

Kilns in stock from October shipment